INGAR   05399
INSTITUTO DE DESARROLLO Y DISEÑO
Unidad Ejecutora - UE
congresos y reuniones científicas
Título:
Simultaneous planning and scheduling of multistage multiproduct batch plants with non-identical parallel units and sequence-dependent changeovers
Autor/es:
FUMERO, YANINA; CORSANO, GABRIELA; MONTAGNA, JORGE MARCELO
Lugar:
Montevideo
Reunión:
Workshop; VIII ALIO/EURO Workshop on Applied Combinatorial Optimization; 2014
Institución organizadora:
ALIO
Resumen:
A mixed integer linear programming model for the simultaneous planning and scheduling of multistage multiproduct batch plants in a multiperiod context is presented in this work. The batch plant is composed by a set of stages with parallel units of different sizes. The scheduling decisions are modeled considering mixed product campaign-based operation mode and sequence-dependent changeover times. Thus, for each time period, the number of batches of each product in the campaign, the batch assignment to units in each stage and its sequencing, and the number of repetitions of the campaign are jointly determined. Also, decisions about production and storage of different products, and raw material consumption and storage are taken into account. The approach capabilities are highlighted through an example.